Update all drawings in a folder or a component - Intergraph Smart 3D - Help - Hexagon

Intergraph Smart 3D Orthographic Drawings

Language
English
Product
Intergraph Smart 3D
Subproduct
Drawings and Reports
Search by Category
Help
Smart 3D Version
13.1

Before you update a folder or a component, you can refresh its documents to determine which documents are out-of-date. See Refresh document status. You do not have to refresh before updating, but it can be helpful to determine which documents are out-of-date.

  1. Right-click a drawings-by-rule folder or component in the hierarchy. The component must contain existing drawings or reports. The folder must contain a component with existing drawings or reports.

  2. On the shortcut menu, click the Update Command. The icons for the out-of-date documents change to show they are updated. If the Batch Server is configured, the command displays the Schedule Wizard.

    Batch Schedule Wizard Common Tasks

  • Documents created automatically in a Drawings by Rule component are automatically deleted by updating the component if the document no longer contains views.

  • You can update an individual document by right-clicking the document and selecting Update or Batch > Update on the shortcut menu.

  • If you place drawing property labels on a template, generate a drawing, move the labels on the drawing, and then update the drawing, the software remembers the new position of the labels on the drawing.