You run Update or Full Update after structure displayed in a view has been modified in other tasks, such as Molded Forms or Structural Detailing.

  1. Right-click a drawing document in the Drawing Console or the Detail View of the Drawings and Reports task, and select Edit to open the drawing in SmartSketch Drawing Editor.

  2. If you know that objects in a view have changed, even if the view is still marked as up-to-date in the Drawings View Explorer, right-click the view in the Drawings View Explorer and select Update or Full Update. A progress bar displays, detailing the update process.

You can update multiple views in the same sheet by selecting the sheet node or the individual sheets.

  1. If you do not know if objects in a view have changed:

    • Right-click the view in the drawing area or the Drawings View Explorer, and select Refresh. The view is marked out of date in the Drawings View Explorer if objects have changed.

    • Right-click the view in the Drawings View Explorer, and select Update or Full Update.

  2. Optionally, right-click the view in the Drawings View Explorer, and select View Log to check the results of the update.