Specifies the time and day you want the batch job to start and in which months you want the job to run. When you click Next, the final wizard page displays the batch schedule settings. If the schedule is incorrect, click Back to return to previous wizard pages and make corrections.
Start time
Specifies the time for the batch job to start. You can select a time using the scroll button or define a time in the format shown.
Day
Specifies a specific day of the month. The batch job runs once per the day specified. For example, if you specified 2 as the value, the batch job runs on the second day of the selected months.
The set weekday
Specifies the day of the week you want the batch job to run. For example, you can set the batch job to run on the second Tuesday of every selected month.
Of the month(s)
Specifies the months you want the batch job to run. You can select multiple months.