Project Operations Command - Intergraph Smart 3D - Administration & Configuration - Hexagon

Intergraph Smart 3D Integration - Project As-Built with HxGN SDx

Language
English
Product
Intergraph Smart 3D
Subproduct
Project As-Built with SDx
Search by Category
Administration & Configuration
Smart 3D Version
13

Opens the Project Operations Dialog so that you can view the As-Built projects that are currently available in SDx. Using the options in the dialog you can allocate, or assign, a project in the Smart 3D Change Management model so that work can begin on it. After a project is allocated, Project Operations enables you to monitor your projects to ensure projects are synchronized between Smart 3D and SDx. This enables you to update a project in Smart 3D to reflect any changes performed to the As-Built project in SDx.

When the As-Built project in SDx and the Smart 3D Change Management model have a different set of claimed objects, the SDx and Smart 3D projects display as out of sync in the Project Operations dialog. In these instances, you can use the Compare feature to display a list of the objects currently claimed for both projects to identify how to resolve the discrepancy and bring the projects back in sync.

The Project > Project Operations command is only available when the following conditions exist:

  • The Model Purpose property for the selected model is set to Change Management.

  • The model is registered with a valid SDx server.

Project Operations Dialog

Compare Dialog

What do you want to do?