Appendix: Disconnected As-Built Project Scenario - Intergraph Smart 3D - Administration & Configuration - Hexagon

Intergraph Smart 3D Integration - Project As-Built with HxGN SDx

Language
English
Product
Intergraph Smart 3D
Subproduct
Project As-Built with SDx
Search by Category
Administration & Configuration
Smart 3D Version
13.1

At some point in the facility's life cycle, design changes associated with maintenance needs or revamp projects for expansion might dictate that some work be done by an Engineering Procurement Contractor (EPC) who does not have access to SDx. Working within a disconnected As-Built project scenario requires some deviations from the standard end-to-end Project As-Built with SDx workflow for the Owner/Operator (O/O) and for the off-line EPC. For simplicity, the tasks required in these instances are organized into the three phases listed below.

Phase One: Prepare the Disconnected As-Built Project for an External EPC

Phase Two: Execute Design Changes in the Disconnected As-Built Project

Phase Three: Complete the Disconnected As-Built Project