A Design- or Planning-split operation with a seam has less than two results - Intergraph Smart 3D - Administration & Configuration

Intergraph Smart 3D Database Integrity Administration

Language
English
Product
Intergraph Smart 3D
Subproduct
Database Integrity
Search by Category
Administration & Configuration
Smart 3D Version
12 (2018)

Message

A Design- or Planning-split operation with a seam has less than two results.

Severity

Fatal.

Detailed Description

Design-split operations or planning-split operations that have seams (not connections or seam points) as inputs and that are not classified as penetrations per their connections require more than one result.

Possible Cause

Unknown.

Possible Impacts

Improper part development.

What You Should Do

  1. Open the model.

  2. In the Molded Forms task, select the object, and modify it, if necessary. Or, select the object, and perform a re-computation to update it.

  3. Re-run the Check Database Integrity custom command and the DBIntegrity report.

  4. If the object is still posted, contact Smart 3D Support.