Displays information about the project and user that changed the drawing status, the time the status was changed, and any comments that were added when the status was changed. Status changing operations include checking out, checking in, fetching a drawing, and undoing a checkout. This dialog box opens when you select drawings in the Tree view and then click Project > Drawing Status.
History
Displays the pertinent information about the selected drawings.