Use the Buffer to Scope Items - Intergraph Smart P&ID - 10.0 - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
10
Smart P&ID Version
10
Smart Engineering Manager Version
11

The buffer in the Project Management table allows you to make a preliminary selection of items that you want to scope.

  1. With the Project Management table in an As-Built plant open, do one of the following:

    • Click PPM All Outputs Graphic on the Project Management toolbar.

    • Right-click in the Project Management table and then click Show/Hide Buffer.

  2. Drag the required items one-by-one to the buffer in the Project Management table.  You can drag items from any of the following:

    • Electrical Index

    • Electrical Engineer

    • EDE

    • a schematic

    • a single line diagram

  3. In the Buffer, click the check boxes next to the items that you want to scope.

  4. Do one of the following:

    • Click PPM All Outputs Graphic on the on the Project Management toolbar.

    • Right-click in the Project Management table and then click Paste from Buffer.