Deactivating a Project in the Overlapping View - Intergraph Smart P&ID - 10.0 - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
10
Smart P&ID Version
10
Smart Engineering Manager Version
11

You can hide a project from the overlapping view by deactivating the tab. Objects specific to that project will then not be seen in the overlapping view.

  • To deactivate, hold Control key and select a project tab (CTRL + Click).

    ADU Expansion3 Deactivated

  • To reactivate the project, use the same method. You cannot deactivate all the projects in the overlapping view. At least one project must remain active.

Clicking a project tab displays the drawing in that project on top, moving the rest of the drawings to the background. All objects in the currently selected project will be displayed in the project's assigned color. Objects that exist only in other projects or objects that have been moved will be displayed in the colors assigned to their respective projects.

Switching Between Projects