Release Claim in Smart Electrical - Intergraph Smart P&ID - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference (2019)

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
2019 (9.0)
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)
  1. In the Project Management table (for a project), select the check box beside each main items for which you want to release the claim.

  2. Do one of the following:

    • Click PPM All Outputs Graphic on the Project Management toolbar.

    • Right-click in the Project Management table and then on the shortcut menu, click Release Claim.

  3. Click PPM All Outputs Graphic to release the claim for the selected items.

  • After setting the claim mode to Release Claim, the status of the items still remains behave exactly in the same way as the scoped items as the software re-scopes them.

  • To claim the items whose claim mode to Release Claim, right-click in the Project Management table and then on the shortcut menu, click Mark as Reclaimed.