Claiming impacts the To Do List and other SmartPlant commands in the following manner.

For Smart P&ID Engineering, it is not possible to run Create or Delete tasks.

Create Task — Running a Create task creates a new item in the stockpile. The new item is claimed automatically as soon as it is created.

Update Task — Running an Update task sets or changes some properties of an existing item. The item to be updated must be claimed before it can be updated. If it is not claimed, the task status is set to Error and a note is added to the Notes area on the General tab of the Task Properties dialog box.

Delete Task — Running a Delete task causes the target item to be deleted. The item to be deleted and possibly other related items must be claimed before the task can do its work. If all of the necessary items are not claimed, the task status is set to Error and a note is added to the Notes area on the General tab of the Task Properties dialog box.

Correlate Items — The SmartPlant > Correlate command correlates pipe runs to the same design basis as an existing pipe run that is already correlated. Properties are copied from the primary pipe run to the other pipe runs. You must claim the pipe runs to be modified. If they are not claimed, they cannot be correlated.