Change the Revision Scheme Supplied by the Tool - Integration - Update 44 - Help - Hexagon

Integration Help

Language
English
Product
Integration
Search by Category
Help
Smart 3D Version
12.1 (2019)
Smart Construction Version
2019(7.0)
SmartPlant Foundation / SDx Version
10
Smart Electrical Version
2019 (9.0)
Smart Materials/Smart Reference Data Version
2020 (10.0)
Smart P&ID Version
9 (2019)
Smart Review Version
2020 (15.0)
Smart Engineering Manager Version
10 (2019)
Smart Interop Publisher Version
13.1 (2019 R1)
Smart Isometrics Version
7.0(2019)
Spoolgen Version
9.0(2019)

The document is revised in a tool to make additional changes. The tool manages its own revision schemes and sets the revision of the document to 5. Rather than selecting a revision scheme to match the tool revision scheme, you choose a new revision scheme.

  1. In the Revision Scheme list, select RevA01.

  2. In the Revise in Tool > Major list, the first major revision is A. A is the first available revision because the document has not been previously published in SmartPlant Foundation.

For a document that has been revised and published previously in a tool with a last revision of B, the first available major is B when you attempt to revise using the Revise dialog box with a compatible revision scheme, such as RevA01. You can accept B or set the revision to a higher major, such as D.