The high-level list below presents the basic tasks required to install and configure Smart 3D in an integrated environment. For more details, see the Smart 3D Installation Guide.
-
Configure the Smart 3D database server
-
Install prerequisite software on Smart 3D database server
-
Install prerequisite software on the Smart 3D workstation
-
Install Smart 3D client software
-
Install and configure the Name Generator Service
-
Install Smart 3D PDS Project Translators
-
Integrate with Smart P&ID
-
Install PDS Export Tools
-
Install PDS Data Access
-
Install Programming Resources
-
Install Piping Specification Remote Access Server
-
Create the site, catalog, and schema databases
-
Create the model and reports databases
-
Assign access permissions
-
Set up server-based Interference Checking
-
Configure the Smart 3D integration plant