Reassign a Step to Another User or Role - Integration - Update 44 - Help - Hexagon

Integration Help

Language
English
Product
Integration
Search by Category
Help
Smart 3D Version
12.1 (2019)
Smart Construction Version
2019(7.0)
SmartPlant Foundation / SDx Version
10
Smart Electrical Version
2019 (9.0)
Smart Materials/Smart Reference Data Version
2020 (10.0)
Smart P&ID Version
9 (2019)
Smart Review Version
2020 (15.0)
Smart Engineering Manager Version
10 (2019)
Smart Interop Publisher Version
13.1 (2019 R1)
Smart Isometrics Version
7.0(2019)
Spoolgen Version
9.0(2019)
  1. In the To Do List, right-click the step that you want to reassign.

    SHARED Tip If your To Do List is not displayed, click To Do List on the Desktop Client toolbar.

  2. Click Reassign on the shortcut menu.

  3. In the Reassign dialog box, select the user or role to which you want to reassign the step. You cannot assign it to both.

  4. Click OK. The software removes the reassigned step from your To Do List, and the step appears in the To Do List of the user or users to whom you assigned the step.