The P6 Dates import updates P6 Activity Dates summarized to the Project and WBS hierarchy.
-
Connect Job: P6 Dates Import
-
EcoSys Action: ITG P6 Dates Import
-
Dependencies: P6 Project and WBS Import
The EcoSys Cost Object External Key field is used to update from the P6 WBS Object ID.
Project level mapping follows the logic described in the section Map an existing EcoSys Project to a P6 Project.
Field Mappings
The default behavior of the Dates integration is to import the minimum and maximum of the P6 Dates at each level of the Project and WBS hierarchy which are listed in the field mapping table below. These dates can be changed by editing the Connect Job.
EcoSys Field |
EcoSys Subject Area |
P6 Field |
---|---|---|
External Key |
Cost Object |
WBS Object Id |
Actual Start Date |
Cost Object |
Actual Start Date (min) |
Actual End Date |
Cost Object |
Actual Finish Date (max) |
Baseline Start Date |
Cost Object |
Baseline Start Date (min) |
Baseline End Date |
Cost Object |
Baseline Finish Date (max) |
Scheduled Start Date |
Cost Object |
Planned Start Date (min) |
Scheduled End Date |
Cost Object |
Planned Finish Date (max) |
Remaining Start Date |
Cost Object |
Remaining Early Start Date (min) |
Remaining End Date |
Cost Object |
Remaining Early Finish Date (max) |