After you schedule a report package, you may need to modify that schedule. For more information about the individual report package schedule settings, see Scheduling a Report Package.

To modify a report schedule:

  1. Click Reports > Schedule Reports in the left navigation bar.

  2. In Asset, select the asset for the report package schedule you want to modify.

  3. In the Schedule Name column, click the name of the schedule you want to modify.

  4. If you want to rename the report schedule, complete the following steps:

    1. Click Save Copy.

    2. In Schedule Name, type a name for the schedule, and then click OK.

  5. Change the email, schedule, and criteria settings as needed.

  6. Click Save.