Adding an Open Port Baseline - PAS ICS Integrity - 7.3 - Help - Intergraph

ICS Integrity Help

Language
English
Product
PAS ICS Integrity
Subproduct
ICS
Search by Category
Help
PAS Version
7.3

An open port baseline uses the Medium Risk baseline type to include the built-in open port features and filters. In addition, the assets need to be Recon assets. Running the baseline creates the baseline in the asset hierarchy. For more information, see Running a Baseline†on page 233.

To create and run the open port baseline:

  1. Open the Asset Model Development Kit (AMDK) on the Integrity server. To open the AMDK, run the following file: InstallPath\DataCollector\AMDK.exe.

  2. Select [PAS Baselines] from the Asset Model field.

  3. Click Baselines > Baseline Management.

  4. Click the Add (+) button.

  5. Type Open Port in the Baseline name field.

  6. In Baseline Type, select Medium Risk.

  7. Select the Recon assets to associate with the baseline, and then click the right arrow (>) button to add them to the baseline.

  8. Select a node where you want the baseline to exist in the asset hierarchy, such as Company Name > Plant 1 > Baseline.

  9. Click Save.