For part failures the system will also perform the calculations. These calculations are still within the same context of the work order and the work order equipment as described above and will still create three different types of record. But additionally, the system will now include:
-
Part number
-
Part organization
-
Component location
The part failures calculation results will also be stored separately in the r5reliabilitypf table.
For part failures to be included, the Component Location must be entered in the part failures table.