SG-14101 Budget | Details | Create Import Utility Template - Missing isselectedagroup flag for group type element - HxGN EAM - 12.2.0.2 - Release Notes - Hexagon

HxGN EAM Release Notes for 12.2.0.2

ft:locale
en-US
Product
HxGN EAM
Search by Category
Release Notes
HxGN EAM Version
12.2.0.2

Description

Using Import Utility to add budget detail level 6 “WO Type Group” with MP1532_AddBudgetDetail_001 results in WS error "Mandatory parameter missing", whereas it is possible to do so without errors from EAM screen Budgets | Details tab.

Error from server.log is:

Steps to Reproduce:

1st) Budget Calendar Type screen:

Calendar Type = AN

Description = CALENDARIO ANUAL

Number of Periods = 12

2nd) Budget Terms screen:

Budget Term = AG1R2024

Description = PRESUPUESTO AGLOMERADO 1 REFACCIONES 2024

Calendar Type = AN

Start Date = 01/01/2024

End Date = 12/31/2024

3rd) Budget Groups screen:

Budget group = TOT-R

Description = TIPO DE OTS PARA PRESUPUESTO DE REFACCIONES

Entity = JBTP Work Order Type

Add Items

4th) Budget Structures screen:

Budget Structure = AG1R2024

Description = PRESUPUESTO AGLOMERADO 1 REFACCIONES 2024

Calendar type = AN

Level 1 = Period

Level 2 = Cost Code

Level 3 = Equipment

Level 4 = Department

Level 5 = Cost Type

Level 6 = WO Type

5th) Budgets screen:

Budget Structure = AG1R2024

Budget Term = AG1R2024

Status = In process

6th) Budgets | Details tab:

Use attached “ALL_UUBUDG_20_L%.xlsx” to add 1st budget and 4 nested sub-level budgets with WS MP1532_AddBudgetDetail_001 via Import Utility.

For parentdetailcode column on all 4 sub-level budgets, need to retrieve R5BUDGETDETAILS.BDT_CODE from the previous level.

7th) Budgets | Details tab:

Now take ALL_UUBUDG_20_L6.xlsx to add level 6 budget details for “WO Type Group”

Expected results: sub-level 6 detail for “WO Type Group” is added.

Actual results: Error “Mandatory parameter missing”