SG-11594 Equipment (A/P/S/L) | Meters | Enter Meter Reading - Last Reading Date is not being populated when Physical Meter is attached and Up/Down Meter is checked - HxGN EAM - 12.1.1.2 - Release Notes/Bulletin - Hexagon

HxGN EAM Release Notes for 12.1.1.2

Language
English
Product
HxGN EAM
Search by Category
Release Notes/Bulletin
HxGN EAM Version
12.1.1.2

 Description 

*Steps to Reproduce:*

# Create a physical meter in the Meter screen

# Add "ea" as a meter unit and save it

# Go to the Asset screen and navigate to the Meters tab

# Add a meter that has "ea" as UOM and add the newly created physical meter

# Check the "Up/Down Meter" and save it

# Click the "Actions" button and "Enter Meter Reading"

# Enter any value and take note of the Date and Time

# Save it.

*Expected Result:* The Last Reading Date has been populated with the Date/Time indicated when the meter reading has been added

*Actual Result:* The Last Reading Date is empty

I can replicate it to all support environment