RCM Potential Yearly Savings - HxGN EAM - Version 11.07.01 - Feature Briefs - Hexagon

HxGN EAM RCM

Language
English
Product
HxGN EAM
Search by Category
Feature Briefs
HxGN EAM Version
11.7.1

The RCM Potential Yearly Savings report shows all equipment that has an associated Risk Assessment or Risk Analysis with a certain Risk Level and that has one or more PM Schedules or Maintenance Patterns attached and activated. Based on the Risk Assessment / Analysis it may be worthwhile to consider not doing any preventive work on the listed equipment. Important report parameters:

  1. Organization - Leave blank for all. Supports wildcards.

  2. RCM Project - Enter the RCM Project.

  3. Equipment - Leave blank for all. Supports wildcards.

  4. Maximum Risk Level - Leave blank for all. If you select a value the system will only include equipment with the same Risk Level or lower. Lower here means the Rating/Threshold of the included Risk Levels is the same or less than that of the selected Risk Level.

  5. Years Included in Avg. - The average cost calculation of this report uses this parameter to determine how far to go back in history for the cost calculation.