Equipment tab - HxGN EAM - Version 11.07.01 - Feature Briefs - Hexagon

HxGN EAM Linear Equipment

Language
English
Product
HxGN EAM
Search by Category
Feature Briefs
HxGN EAM Version
11.7.1

On the Equipment tab of the PM Schedules screen, you can define the PM work that must be executed for the linear equipment. The following includes fields relevant to the linear breakdown, not a complete overview of the tab.

This tab has the following important attributes relating to the linear breakdown:

  • Set ID - All sections of the breakdown will be assigned the same unique identifier. This tells the system that these records belong together. Set ID is a system generated number that is used when you use the Breakdown Linear Work tab and cannot be assigned by manually. If the Set ID is populated the following fields cannot be changed on this tab.

    • Period Interval

    • Period UOM

    • Due Date

    • Dormant Start

    • Dormant End

    • Reuse Dormant Period

    • PM Type

    • Date Deactivated

    • Meter1 Interval

    • Meter1 UOM

    • Reading1 Due

    • Meter2 Interval

    • Meter2 UOM

    • Reading2 Due

    • From Point

    • To Point

  • From Point - Enter the starting point of the work on the linear equipment.

  • From Point Ref. Description - Free text field.

  • From Point Geographical Ref. - Free text field.

  • To Point - Enter the ending point of the work on the linear equipment.

  • To Point Ref. Description - Free text field.

  • To Point Geographical Ref. - Free text field.

Deleting equipment records is possible even if a Set ID is entered on the record, but the system will request confirmation in this case.