The Equipment tab contains the equipment details and its related maintenance activities to be performed (e.g. service period, part replacement, and refurbishment due).
-
Click the Equipment tab.
-
Select Include Equipment to include the equipment in the Investment Plan.
-
Type the Priority Override.
The Priority Override value is reflected in the Planning Result Settings > Investment Plan Equipment Settings panel only for the selected equipment to be included.
-
Click SAVE.