RCM potential yearly savings report - HxGN EAM - 12.0.1 - Help - Hexagon

HxGN EAM Help

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
12.0.1

Menu Path

Equipment > Reports > RCM Potential Yearly Savings

Description

This report displays equipment or non-critical assets up to a certain risk level with PM and maintenance pattern cost information attached. The costs are converted to an annual budget and provide data on potential savings in the case where preventive maintenance is not performed on non-critical assets.

Only assets with the maximum risk level or lower threshold risk levels are selected and displayed.

Related topics

RCM potential yearly savings