Equipment costs by ranking chart - HxGN EAM - 12.0.1 - Help - Hexagon

HxGN EAM Help

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
12.0.1

Description

Displays equipment costs by Risk Priority Number, Ranking Score; Condition Score, or Facility Condition Index.

Menu Path

Equipment > Reports > Equipment Costs by Ranking Chart

Parameters

Specify the X-Axis and Y-Axis categories for the chart. You can select Risk Priority Number, Ranking Score, Condition Score, or Facility Condition Index for either axis of the chart.

Select Include WOs to specify which equipment costs to include in the report.

Specify the Min. Cost Included to set the minimum equipment work order costs to include with this report. Specify the Start Date and End Date.

Specify Max. Records Ranked to specify the maximum number of equipment records included in the report.

Specify Rank By to select how the Rank Category records are ranked. Select Top to display equipment records with the highest values or Bottom to display equipment records with the lowest values.

Report Type

Basic