Entering meter readings in a batch - HxGN EAM - 12.0.1 - Help - Hexagon

HxGN EAM Help

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
12.0.1

Enter meter readings or meter differences on the Batch Meter Readings form.

In some cases, the default UOM is a parent meter attached to one or more Child ("Receiving") meters of the same UOM. In such cases, the new meter reading must roll down the hierarchy. See Creating equipment hierarchies.

To enter batch meter readings:

  1. Select Equipment > Process > Batch Meter Readings.

  2. Specify this information:

    Equipment - Specify the equipment for which to enter meter readings.

    UOM - Specify the unit of measure.

    Meter - Specify the meter code.

    Difference - Select to calculate the difference between the last meter reading and the current reading.

    Difference is calculated by adding the new value entered to the last meter reading.

    Date/Time - Specify the date and time of the meter reading.

    The date entered must occur between the date of the last meter reading and the current date. The current date is automatically populated.

    New Value - Specify the meter reading value.

    Work Order - Specify the work order. Related Work Order is automatically populated.

  3. Click Update Meters.

    The meter readings are updated unless an error message is generated. In this case, the error is listed in the Error Message field, and the row remains in the grid to be edited.