Setting up revision control for permits - HxGN EAM - 12.0.1 - Help - Hexagon

HxGN EAM Help

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
12.0.1

Designate which permit fields, tabs, and link buttons will be protected when isolation point revision is not Unfinished.

To set up revision control for permits:

  1. Select Work > Revision Control > Revision Control Setup.

  2. Click the Permits tab.

  3. Specify this information:

    Protect - Select to protect the field on the Permits form and all permit-related tabs.

  4. Click Save Record.