-
Plan for Improvement No. field - Document the PFI# for projects submitted to The Joint Commission.
-
Preconstruction Risk Assessment checkbox – Confirm using checkbox that a preconstruction risk assessment is needed for a project.
-
Design Criteria dropdown – Select from a prepopulated list what the project design is based on to satisfy TJC requirements.