Link the Objects - EcoSys - 4.01 - Help - Hexagon PPM

EcoSys Projects Help (4.01)

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Standard Version
4.01

To map an estimate object to required project object, perform the following:

  1. In the Estimate Structure Map panel, click the Link hyperlink corresponding to the estimate object that needs mapping.

    The Link hyperlink appears corresponding to all the project objects with Cost Control Level set to Yes in the Project Structure Map Link panel.

  2. In the Project Structure Map Link panel, click the Link hyperlink corresponding to the project object that needs mapping.

    In the Estimate Structure Map panel, the Path ID of the project object appears in the Mapped to Object column and a Remove Link hyperlink appears in the Link Estimate column.