Testing the P6 API within EcoSys - EcoSys - Installation & Upgrade - Hexagon

EcoSys Primavera P6 Adapter Installation

ft:locale
en-US
Product
EcoSys
Search by Category
Installation & Upgrade
EcoSys Version
9.1
  1. Log in to EcoSys, and click Admin > System Status & Logs > System Information.

  2. Click the Integration tab, and then select Test Primavera Connection.

    The status should display similar to the screenshot below.