Testing the P6 API within EcoSys - EcoSys - Installation & Upgrade - Hexagon PPM

EcoSys Primavera P6 Adapter Installation

PPMProduct
EcoSys
PPMCategory_custom
Installation & Upgrade
Version_EcoSys
8.7
  1. Log in to EcoSys, and click System Information.

  2. Click the Integration tab, and then select Test Primavera Connection.

    The status should display similar to the screenshot below.