JBOSS/WildFly and P6 Integration with EcoSys - EcoSys - Installation & Upgrade - Hexagon PPM

EcoSys Primavera P6 Adapter Installation

PPMProduct
EcoSys
PPMCategory_custom
Installation & Upgrade
Version_EcoSys
8.7
  1. Stop the service

  2. Delete the following files from the \modules\com\primavera\main folder:

    • intgserver-wrapper.jar

    • module.xml

  3. From the EcoSys installation media, unzip the \EcoSys\alt\deploy\esfm-jboss-wildfly-overlay-<db>.zip file to the \modules\com\primavera\main folder.

  4. Copy all of the Primavera API .jar files from the P6 Integration API \lib directory to the \modules\com\primavera\main folder.

  5. Start the service.

  6. Skip to the section Testing the P6 API within EcoSys.

For P6 18.8 use the files from the P6 17.12 templates folder.