Create or Update P6 WBS from EcoSys Cost Objects

This job will export EcoSys Cost Objects to P6 WBS. The P6 Project must already exist and by mapped to the EcoSys project using the P6 Project ID in the EcoSys Project Setup screen. This is the same mapping process described in the Project Setup section above.

P6 WBS will be created, updated, or moved within the WBS hierarchy. However, the integration does not delete WBS objects in P6 to ensure there are no unexpected changes to the P6 schedule.

The mapping between P6 WBS and EcoSys Cost Object is maintained by the "P6WBSObjectId" custom field. This field will store the P6 Object ID of the P6 WBS.

  • Connect Job: EcoSys CO to P6 WBS

  • EcoSys Action: ITG Cost Object to P6 WBS

Field Mappings

The following table shows the field mapping for the Project update part of the job:

EcoSys Field

EcoSys Subject Area

P6 Field

Cost Object ID

Cost Object

WBS Code

Cost Object Name

Cost Object

WBS Name

P6 WBS Object ID

Custom Field (Text)

WBS Object ID

Parent P6 WBS Object ID

Related Object

WBS Parent Object ID

Create or Update P6 Activity Codes from EcoSys Cost Objects

This job will export EcoSys Cost Objects to P6 Project-level Activity Codes.

The P6 Activity Code Type Name is specified by the EcoSys Connect Global Setting list: "P6Connector.CostObjectToActivityCode".

If the P6 Activity Code Type does not yet exist for the P6 Project then it will be created. The Object ID of the P6 Activity Code Type will be stored in the "P6 CBS AC Type Object Id" custom field on the EcoSys Project-level Cost Object.

P6 Activity Codes will be created, updated or moved within the hierarchy. However, the integration does not delete Activity Code objects in P6 to ensure there are no unexpected changes to the P6 schedule.

The mapping between P6 WBS and EcoSys Cost Object is maintained by the "P6WBSObjectId" custom field. This field will store the P6 Object ID of the P6 WBS.

  • Connect Job: EcoSys CO to P6 Activity Code

  • EcoSys Action: ITG Cost Object to P6 Activity Code

Field Mappings

The following table shows the field mapping for the Project update part of the job:

EcoSys Field

EcoSys Subject Area

P6 Field

Cost Object ID

Cost Object

Code

Cost Object Name

Cost Object

Description

P6 WBS Object ID

Custom Field (Text)

Object ID

Parent P6 WBS Object ID

Related Object

Parent Object ID