View Batch Job Item Report - EcoSys - 4.11 - Administration & Configuration - Hexagon

EcoSys Core and Projects Administration (4.11)

Language
English
Product
EcoSys
Search by Category
Administration & Configuration
EcoSys Standard Version
4.11

The batch job item report is similar to the batch job report but contains more details, such as the parameters utilized when the action or action batch was executed.

  1. Navigate to Admin > System Status & Logs > Batch Job Item Report.

  2. At the top of the screen, in the tool bar, perform the following:

    • Type the required Batch Job. When the report is produced, only those events matching that batch job appear.

    • Type the required message type in the Message Type Contains column. When the report is produced, only those events matching that message type appear.

    • Type the required message in the Message Contains column. When the report is produced, only those events matching that message appear.

  3. Click the Run button.

    SHARED Tip The report may be exported to Excel or a PDF.