Import Labor Cost Details - EcoSys - 3.01 - Administration & Configuration - Hexagon PPM

EcoSys Core and Projects Administration (3.01)

Language
English
Product
EcoSys
Search by Category
Administration & Configuration
EcoSys Standard Version
3.01

Follow the procedure to import labor costs.

  1. Click the Import Crews tab.

  2. In the Import Crew Labor panel, navigate to Sheet > Import. The Import Spreadsheet dialog box appears.

  3. Click the Choose File button to select the required file.

  4. Select the required Format as per the selected file. The available values are listed below:

    • Excel

    • Tab-delimited

  5. From Import Rule for Incoming Records, select the Create New / Update Existing option.

    On selecting this option, the system makes sure if the Internal ID of the new labor cost details records matches the internal ID of an existing records, then values on the existing records get updated.

  6. Select the Preview data before saving check box to validate the data before importing.

  7. Click the OK button to import the file.

    Verify the data on the screen, if there are any missing or blank fields, click the Refresh button to discard the data and repeat the above procedure to import the file again.

  8. Click the Save icon.

    You can customize the view of the labor cost details from the view settings.