Generate Pending Transmittal Report - EcoSys - 4.02 - Help - Hexagon PPM

EcoSys Contracts Help (4.02)

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Standard Version
4.02

To view the Pending Transmittal report, perform any of the following actions.

  • View the report in the Transmittals screen:

    1. Navigate to Contracts > Transmittals.

    2. At the top of the screen, in the green parameter bar, click the Contract ellipsis to select the required project.

    3. Click REFRESH for screen update.

    4. Click the Reports tab.

    5. Click the Pending Transmittals hyperlink.

    6. Click the Contract ellipsis to select the required contract. By default, the last selected contract appears.

    7. Click RUN. The preview of the report appears.

  • View the report from the Reports menu:

    1. Navigate to Reports > Contract Registers > Pending Transmittals.

    2. Click the Contract ellipsis to select the required contract. By default, the last selected contract appears.

    3. Click RUN. The preview of the report appears.