This procedure changes the status of a safety item with a Draft status to Open, as well as re-open a closed safety item. A log entry appears in the Log tab.

  1. Navigate to Contracts > Safety Items.

  2. At the top of the screen, in the green parameter bar, click the Contract ellipsis to select the required project.

  3. Click REFRESH to update the screen.

  4. Click the Actions list and select Open Safety Item.

  5. Click the Safety Item ellipsis to select the required safety item.

  6. (Optional) Type a Comment

  7. Click Run and then OK. The status of the safety item changes to Open in the Safety Item Register panel.