This procedure changes the status of the safety item with the Draft or Open status to Closed. A log entry appears in the Log tab.

  1. Navigate to Contracts > Safety Items.

  2. At the top of the screen, in the green parameter bar, click the Contract ellipsis to select the required project.

  3. Click REFRESH to update the screen.

  4. Click the Actions list and select Closed Safety Item.

  5. Click the Safety Item ellipsis to select the required safety item.

  6. (Optional) Select the Close Date.

  7. (Optional) Type a Comment

  8. Click Run and OK. The status of the safety item changes to Closed in the Safety Item Register panel.