Graphical Updates
-
Instantaneous center-of-rotation calculation.
-
Element Highlight.
-
Element Range.
Rotating Equipment Report Updates
-
API 610 7th Edition Addition.
-
SI/User Units.
-
HEI Additions.
WRC 107 Updates
-
Simplified input.
-
WRC 297 stress calculations.
Miscellaneous Modifications
-
Screen data presentation changes.
-
Direct control jumping between executables.
-
Increased number of allowed software designed hangers.
-
Additional spring hanger design options.
-
Database updates include additional spring hanger tables.
-
Soil Modeler for Buried Pipe.