RCM Risk Levels

HxGN EAM RCM

ft:locale
en-US

The RCM Risk Levels report shows all equipment that has an associated Risk Assessment, Risk Analysis, or FMECA. Important report parameters:

  1. Organization: Leave blank for all. Supports wildcards if ‘Include Children’ is not checked.

  1. RCM Project: Enter the RCM Project.

  2. Equipment: Leave blank for all. Supports wildcards if “Include Children” is not checked.

  3. Risk Level: Leave blank for all. If you select a value the system will only include equipment with the same Risk Level or higher. Higher here means the Rating/Threshold of the included Risk Levels is the same or higher than that of the selected Risk Level.

  4. RCM Level: Set to include equipment with a Risk Assessments, with a Risk Analysis, or with both.

  5. Include Children: The report will include the children of the select Equipment. For example, if you report on a production line all assessments and analysis from children will be included.

  6. Include Functions: The report will list the Functions of the included equipment.

  7. Include Failure Modes: The report will list the Failure Modes of the included equipment.