The RCM Equipment at Risk report shows all equipment that has an associated Risk Assessment or Risk Analysis with a certain Risk Level and that has no PM Schedule or Maintenance Pattern attached or, if attached, it is not activated. Based on the Risk Assessment / Analysis it may be worth to consider doing preventive work on the listed equipment. Important report parameters:
Organization: Leave blank for all. Supports wildcards.
RCM Project: Enter the RCM Project.
Equipment: Leave blank for all. Supports wildcards.
Minimum Risk Level: Leave blank for all. If you select a value, the system will only include equipment with the same Risk Level or higher. Higher here means the Rating/Threshold of the included Risk Levels is the same or higher than that of the selected Risk Level.